{"id":79,"date":"2016-11-07T18:01:08","date_gmt":"2016-11-07T23:01:08","guid":{"rendered":"https:\/\/sgv.hbnv.com\/?page_id=79"},"modified":"2016-11-17T10:41:47","modified_gmt":"2016-11-17T15:41:47","slug":"deck-procedure","status":"publish","type":"page","link":"https:\/\/sgv.hbnv.com\/?page_id=79","title":{"rendered":"Deck Procedure"},"content":{"rendered":"<p>date:\u00a0 ______________<\/p>\n<p>TO:<\/p>\n<p>FROM:\u00a0 PATRICIAN ASSOCIATES<\/p>\n<p>RE:\u00a0 DECK REPLACEMENT POLICIES, PROCEDURES AND SPECIFICATIONS<\/p>\n<p>Attached are the policies and procedures outlining the steps necessary to replace a deck at Stonegate Village.\u00a0 It will be necessary for you or your contractor to sign and return this package to us for processing.\u00a0 For direct replacement of an original deck the Association will handle all matters regarding the replacement of the deck.\u00a0 In the case where the Association is providing funds, all policies and procedures must be followed by the homeowner and the contractor.\u00a0 All disbursements will be made payable to contractor.<\/p>\n<p>CONTRACTED PRICE\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 _____________<\/p>\n<p>ASSOCIATION CONTRIBUTION\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 _____________<\/p>\n<p>BALANCE DUE CONTRACTOR FROM HOMEOWNER\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 _____________<\/p>\n<p>I CERTIFY THAT I HAVE READ AND WILL COMPLY WITH ALL THE POLICIES AND PROCEDURES AS OUTLINED IN THE ATTACHED.<\/p>\n<p>__________________________\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ________________<\/p>\n<p>UNIT OWNER\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 DATE<\/p>\n<p>_________________________\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ________________<\/p>\n<p>UNIT CO-OWNER\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 DATE<\/p>\n<p>_________________________\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 ________________<\/p>\n<p>CONTRACTOR\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 DATE<\/p>\n<p>PROCEDURES FOR DECK REPLACEMENT<\/p>\n<p>1.\u00a0 Send a detailed drawing, showing size materials, please see page 4 regarding Deck Specification, and type of construction to be used, to the Stonegate Village Condominium<\/p>\n<p>Association Board of Trustees (B.O.T) for their review and approval.<\/p>\n<p>2.\u00a0 Once approved by the B.O.T., the drawing must be approved by the Building Inspector of the Borough of Stanhope.<\/p>\n<p>3.\u00a0 Obtain a building permit from the Borough of Stanhope.<\/p>\n<p>4.\u00a0 You are required to install supports and footings.\u00a0 Remember to have the ground inspected for electrical, telephone, water and any other utility lines.\u00a0 This is the responsibility of the homeowner and contractor.<\/p>\n<p>5.\u00a0 Send the signed and sealed drawing back to the B.O.T.\u00a0 Include a copy of the Construction Contract and building permit, along with copies of the contractor currently enforce insurance policies appropriate to the performance of the job.<\/p>\n<p>6.\u00a0 After the deck construction is completed, the deck must be stained in accordance with the color scheme within the complex.\u00a0 Stain must be requested through the management company.\u00a0 Upper and Lower decks must conform in every aspect specifically staining with an agreement in writing verifying same by both unit owners.<\/p>\n<p>7.\u00a0 Partial payment will be withheld by the Association until final building approval is displayed.<\/p>\n<p>POLICYS ON DECK REPLACEMENT<\/p>\n<p>1.\u00a0 As required by the By-Laws of the Stonegate Village Condominium Association, it will be responsibility of the Association to maintain all ORIGINAL or ORIGINAL SIZES replacement decks.<\/p>\n<p>2.\u00a0 Deck work, as described in item (1) will be made at the expense of the Association, including the repair and painting or staining.\u00a0 Coatings must be obtained from the Association.<\/p>\n<p>3.\u00a0 All decks that have been altered are the responsibility of the homeowner.<\/p>\n<p>4.\u00a0 The Association will continue to provide all deck owners with the coatings necessary to maintain the aesthetics of the deck.\u00a0 Homeowners who fail to maintain the deck properly will have the job done by the Association, but charged to the homeowner. Powerwashing of nay altered decks will be the responsibility of the homeowner.<\/p>\n<p>5.\u00a0 All homeowners are required to follow the procedure and specifications as outlined in this package.<\/p>\n<p>6.\u00a0 On all original decks the scheduling of repairs, application of coatings or replacement of decks will be the responsibility of the Board of Trustees.<\/p>\n<p>DECK SPECIFICATIONS<\/p>\n<p>1.\u00a0 All wood material must be Wolmanized.\u00a0 (Pressure Treated)<\/p>\n<p>2.\u00a0 All Fastening devices, screws, nails, bolts etc. are to be galvanized.<\/p>\n<p>3.\u00a0 Footings to support girders or support columns to be 4\u201d minimum, 6\u201d maximum above finished grade \u2013 12\u201d diameter.<\/p>\n<p>4.\u00a0 Existing and new deck material is the contractors responsibility to remove from the site.\u00a0 (Dirt may be placed behind the pool area, however, Contractors may not use Association dumpsters).<\/p>\n<p>5.\u00a0 All work to follow local building codes.<\/p>\n<p>6.\u00a0 All work to be neat in workmanship like manner.<\/p>\n<p>7.\u00a0 All digging is the contractor\u2019s responsibility, please note item #3 in the Procedures for Deck Replacement.<\/p>\n<p>8.\u00a0 All new stain must be Behr, Plus 10 Deck &amp; Siding Stain #2-717 Redwood Natural Tone.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>date:\u00a0 ______________ TO: FROM:\u00a0 PATRICIAN ASSOCIATES RE:\u00a0 DECK REPLACEMENT POLICIES, PROCEDURES AND SPECIFICATIONS Attached are the policies and procedures outlining the steps necessary to replace a deck at Stonegate Village.\u00a0 It will be necessary for you or your contractor to sign and return this package to us for processing.\u00a0 For direct replacement of an original &hellip; <a href=\"https:\/\/sgv.hbnv.com\/?page_id=79\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Deck Procedure&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"class_list":["post-79","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/sgv.hbnv.com\/index.php?rest_route=\/wp\/v2\/pages\/79","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgv.hbnv.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sgv.hbnv.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sgv.hbnv.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/sgv.hbnv.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=79"}],"version-history":[{"count":2,"href":"https:\/\/sgv.hbnv.com\/index.php?rest_route=\/wp\/v2\/pages\/79\/revisions"}],"predecessor-version":[{"id":158,"href":"https:\/\/sgv.hbnv.com\/index.php?rest_route=\/wp\/v2\/pages\/79\/revisions\/158"}],"wp:attachment":[{"href":"https:\/\/sgv.hbnv.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=79"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}